澳门新葡新京官方网站,澳门新葡新京app下载

全国热线:18678836125

新闻中心

当前位置:澳门新葡新京官方网站-新闻中心-鱼缸订制底部采取粘接方式有哪几个步骤

鱼缸订制底部采取粘接方式有哪几个步骤

  • 来源: 日期:2020-05-05 发布人:admin 阅读数:
  济南澳门新葡新京馆顺序推荐四边形胶粘剂底部的包,因为它可以减少轴承的底部,边缘将分散到四个重量,也可以内部支撑转移到油缸的底部,是美丽的和容易主缸和回来,过滤器和其他设施,也便于清洁主缸,而且也不影响胶的内部发挥(因为底部应该是内部支撑必须破坏胶的加强周围的底部)。
  Jinan aquarium recommends quadrilateral adhesive bottom package in sequence, because it can reduce the bottom of the bearing, the edge will be scattered to four weights, and the internal support can also be transferred to the bottom of the oil cylinder, which is beautiful and easy to master cylinder and return, filter and other facilities, and also easy to clean the master cylinder, And it does not affect the internal performance of the glue (because the bottom should be the bottom around which the internal support must break the reinforcement of the glue).
  双方首先在底部的玻璃鱼缸里面的两个外部拉下来,下拉栏的宽度应小于或等于气缸的大小从罐底边缘的底板(更好是等于,所以不必等待胶水干燥,好的工作,也可以更好的传播鱼缸的重量。
济南鱼缸订制
  Both sides first pull down the two outer parts of the glass fish tank at the bottom. The width of the pull-down bar should be less than or equal to the size of the cylinder from the bottom edge of the bottom plate of the tank (it is better to be equal to or equal to, so it is not necessary to wait for the glue to dry. Good work can also better spread the weight of the fish tank..
  济南鱼缸定制
  Jinan fish tank customization
  后撑粘接牢固,左拉在钢筋粘在天花板上,然后在左下角立面用胶水,然后把地板左胶水,以同样的方式再次胶粘剂的右侧,然后后板两侧立面用胶水,后面板将会收到两边的板和地板,然后后面面板和外部底部和两边的板边粘上胶带,宽幅分别再上胶前面板,也应在前面板和两侧的板宽幅上胶带。
  The back support shall be firmly bonded. Pull the left reinforcement to the ceiling, then glue the lower left corner facade, then glue the left floor, and glue the right side of the floor again in the same way. Then glue the two sides of the rear panel facade. The rear panel will receive the two sides of the board and floor, and then glue the rear panel and the external bottom and the two sides of the board, The width of the front panel shall be glued separately, and the tape shall also be applied to the width of the front panel and the boards on both sides.
  前后面板的外底拉筋应等到玻璃胶固化(超过48小时)后,罐侧朝下再粘贴。采用底包四面粘贴方式,一般是在前、后两面面包。
  The outer bottom tie bars of the front and rear panels shall be pasted when the glass adhesive is cured (more than 48 hours) and the tank side is downward. The bottom package is pasted on four sides, generally on the front and back sides.
  将一楼平靠在墙上,然后靠墙面板设置后,然后在地板上,发挥后胶的位置,要考虑玻璃板的厚度),胶粘剂的后面板,然后让助手扶正器,和左侧板边缘的底部的左侧立面上胶后,将左侧板胶,胶面板,在印版的左侧靠侧靠底面,沿贴胶位置分别贴宽幅胶带,再贴在印版的右侧用同样的方法,然后贴在前面板上。
  Lay the first floor flat on the wall, then set the wall panel, then on the floor, play the position of the back glue, consider the thickness of the glass panel), glue the back panel of the adhesive, then let the assistant centralizer, and glue the left panel, glue the left panel, On the left side of the plate, side by side and bottom, respectively paste wide tape along the gluing position, then paste it on the right side of the plate in the same way, and then paste it on the front panel.
  以上是济南鱼缸订制公司为大家介绍的相关内容,想要了解更多内容,欢迎访问网站:
  The above is the relevant content introduced by Jinan fish tank customization company. To learn more, please visit the website:

版权所有:澳门新葡新京   All rights reserved
XML 地图 | Sitemap 地图